Application for a site at an exhibition, fair
Relevant department : Trade
Description : Written application to be forwarded to the Board of Mayor and Aldermen specifying the type and size of stand or attraction and, where appropriate, the electricity and/or water consumption
What do you have to take with you? :
Issuance period : a maximum of one month
Description : Written application to be forwarded to the Board of Mayor and Aldermen specifying the type and size of stand or attraction and, where appropriate, the electricity and/or water consumption
What do you have to take with you? :
Issuance period : a maximum of one month
Cost of the electrical connection: €2.48 for lighting, €3.72 for lighting and power




